| Jacket |
S.S. 304 . Jacket will be suitable for steam heating cum electric heating |
| Bottom Clearance |
500 mm from ground level to valve or as required. |
| Finish |
External of the DM water tank will be buffed to satin finish.
The internal of the WFI WATER TANK will be grinded to very smooth finish. Care is taken such that there are no dead pockets where any emergence of microbacteria growth is there. All the joints are finished very finely and FINALLY THE ENTIRE VESSEL IS ELECTROPOLISHED TO 280 GRIT MIRROR FINISH.
Special care is taken for the bottom discharge valve such that every drop is drained out and there is no retention
|
| PUMPS (optional) |
The internal of the WFI WATER TANK will be grinded to very smooth finish. Care is taken such that there are no dead pockets where any emergence of microbacteria growth is there. All the joints are finished very finely and FINALLY THE ENTIRE VESSEL IS ELECTROPOLISHED TO 280 GRIT MIRROR FINISH.
Special care is taken for the bottom discharge valve such that every drop is drained out and there is no retention
|
RECIRCULATION
PIPELINE (optional)
|
A suitable HP Sanitary pump is provided in S.S. 316 L. |